KneeDeep
Active Member
- Joined
- Jan 29, 2022
- Messages
- 123
- Reaction score
- 125
Search for the 2023 order tracking spreadsheet and submit your info. @OfficerDirtySanchez created it. It works for 2024 orders too.
Filling your order number and your last name or company that you ordered under and you can track it. It’s not very accurate.I try not to ask stupid questions, but...
I saw all the status codes in another post, but how are you seeing the actual status of your build? Is this something I can just enter my vin in at a website? Or is @brv10 the only one on this post with access?
Scheduled to arrive in Eagle Pass today for the ride to Port Allen.
May be delayed due to bridge collapse in Baltimore this morning.Those of us in the Northeast should be getting an update soon. Our ship is arriving at Port Alramira MX. once our Trucks are loaded the ship sets sail for Port Davisvlle in RI. Looks like they’re expecting the ship to arrive on 4/3/24 from (FCA) Mexico.
That would suck! I’ve been watching the ships route that it takes on this trip that it makes to Davisville. The ship status a few hundred miles off the East coast of the USA. It goes around the top of Long Island then cuts back in towards Rhode Island. Besides brv10 informed me that my truck seems to be on the cargo ship “Eurocargo Bari” which is entering Davisville Rhode Island as we speak. . I wonder if FCA cares if the truck is delivered before the end of the month.May be delayed due to bridge collapse in Baltimore this morning.
Wow, that was quick pick up and trip! Thanks bud!
Ok, who did you bribe to get shipped?? Mine was built before yours and is also going to Lake Charles, but 3+ weeks after being built, it’s still sitting waiting for transport
Most I see are 5 days, to be on the safe side 5 days 22 hours, it's usually shorter than that.anyone know how long is the ride from Eagle Pass to Port Allen usually when having these trucks delivered?
Your not getting a train until mine gets delivered. I greased the wheelsNo train yet, still JSLD.