I've got an L3 on order with - White - Tow Package, Safety Package, Bed Package and the Aux backup camera for the mirror. I ordered on January 12th.
Other models that have the Camera package and Safety Package are getting built. But according to the sequencing spreadsheet no Power Wagons have been built in the last 2.5 weeks (though the spreadsheet isn't updated for last week). I suspect there is a PW part shortage but with people getting build dates perhaps they know when the parts are arriving.
There was a local PW in transit that was identical to the one I have on ordered. But when I called they said they were going on an old build date and the build got pushed back to D status and wasn't actually in transit. I'm somewhat happy to see this because this was ordered after mine and I was wondering why/how it got built before mine.
They even took it off their website but I found it on ramtruck.ca
https://www.ramtruck.ca/en/windowsticker/3c6tr5ej7ng287803?&campaign=&affiliate=
Identical to mine but with the vsim and backup alarm. If this ships before mine I might cancel and get this one. But I'll be paying a higher sticker price than what I ordered back in January so we will see.