It's hit or miss for everything. SRW 2500 been sitting KZ for 82 days, whereas I've seen several DRW built after me and ship before me.Anyone notice it just appears to (primarily) be Dually's that are stuck in KZ? SRW's getting shipped shortly after build
#NoDRWTrainCapacityConspiracy
Srw limited 2500 75days lost in the abyssIt's hit or miss for everything. SRW 2500 been sitting KZ for 82 days, whereas I've seen several DRW built after me and ship before me.
I here you#DStatues for Life lol maybe one day it will become real
View attachment 38837
It's both.Anyone notice it just appears to (primarily) be Dually's that are stuck in KZ? SRW's getting shipped shortly after build
#NoDRWTrainCapacityConspiracy
From what I gather, no way to know unless you can track the transport truck itself. Some of those companies have good tracking...others, none.Is there a way to know when your ordered vehicle is on the transport truck after being delivered to the port near your dealer without calling the dealer? Ours got to the Port of Baton Rouge last week, but just wondering what timeframe we are looking at for it to go from that huge parking lot they keep the new vehicles in to being transported 20 minutes away to our dealer.
Sandi told me today that when my truck reaches the port it'll be 2 to 3 weeks before moving to themIs there a way to know when your ordered vehicle is on the transport truck after being delivered to the port near your dealer without calling the dealer? Ours got to the Port of Baton Rouge last week, but just wondering what timeframe we are looking at for it to go from that huge parking lot they keep the new vehicles in to being transported 20 minutes away to our dealer.
My 2500 Limited was also built on 5/19. Still awaiting shipping to east coast.I spoke with customer service today and they advised I was KZL. I'm really hoping by the end of June. I've been hired to tow RVs out of Indiana by a couple companies. There's a few add on equipment items to schedule being installed.
Hopefully yours sobered up enough to find it’s way back to the vendor yard and it won’t be much longer. Just hope it doesn’t get drunk again and can’t find the train yardGOOD! Maybe the vendors can get back to work on mine since I am sure they've all been partying with yours
Same start, mine was built the 27th. Build sheet showed up the 30th. Interestingly my estimated delivery date that showed on the 23rd turned into a big fat TBD on the 27th. But at least it's built....Finally Built! Started production 5/23, built 5/31 so they say, didn't show up as built until this afternoon. No window sticker yet.
Prior to status change, estimated delivery was 7/3.
If it’s future owner (me) is any indicator, then doubtful…lolHopefully yours sobered up enough to find it’s way back to the vendor yard and it won’t be much longer. Just hope it doesn’t get drunk again and can’t find the train yard
I hope mine is here by my birthday in July.. I’ll be 86 and my 23 year old wife is excited about it being here by then..If it’s future owner (me) is any indicator, then doubtful…lol
****, you must have that *Long Bed* ....I hope mine is here by my birthday in July.. I’ll be 86 and my 23 year old wife is excited about it being here by then..
If possible, hope that logistics upper management is looking at ways to solve it. Shutting down the plant would really push the build dates back.From my dealer.View attachment 38856