Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
I was sent this screenshot.
On Edit: I will add that the order cutoff date for C&C corresponds with the date I was given by a dealer in PHX completely unrelated to this chart, so...
Just for information the Donlen site is a Hertz company and is for fleet sales. It seems to be a barometer for what happens in the retail side but is not 100% accurate. They have those disclaimers on the bottom of the site. https://www.donlen.com/build-out-start-up-dates.html
Read on Cummins forum from the resident dealer over there, he said order banks close in June. They may still build those orders through August, but, that would put the 20s on a normal release cycle. The 20s will likely be the same truck, still in Mexico (I did see the blue streak will be replaced in 20). I think 22 is the best case for a true 5th gen.
Yes the HD will get an overhaul for 2022. Until then it will likely stay as is with possibly some minor changes and yes blue streak goes away for 2020.
Where are yall seeing Blue Streak going away? Is it being replaced with another bright blue?? A 2500 is on the horizon for me but in a holding patter right now but really want the blue streak.
Has anyone been able to confirm the availability of 4.10 on srw trucks? I’ve read mixed answers someone even mentioned they have seen a build sheet with that option on it at a dealer?