I feel like I'm behind the current glut of guys that are trying to get train schedules and such, but I couldn't find a solid answer to this looking through the thread. I was told on 2/14 that my truck was in Production 2/13. As of today (the 16th) it still shows the same thing. Once you hit being built, doesn't it pop out the other end as " built" in a day typically? Or is it not 'Built/ Complete' until it gets all the vendor stuff installed? I have a bedliner and steps, so I know I'll have some more waiting for it to get to the transportation stage. Looking at the tracking spreadsheet, some trucks seem to go from 'In Production' to 'Built' the next day while others seem to get stuck in that Production status for a week. Hopefully the fact mine hasn't moved yet doesn't mean its sitting in the re-work inspection bay at the end of the line.