Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 HD Crowdsourced VIN/Order Tracking

Big Baloo

Active Member
Joined
Jun 13, 2022
Messages
150
Reaction score
181
Location
Alabama
Trying to find out but I can't log onto VOIM right now. I did find it interesting that Ram far outsold the other Stellantis vehicles and the HD was only 200 units behind the 1500.
Do you think they're trying to out build the 1500? "Challenge Accepted!...Maybe"
 

Big Baloo

Active Member
Joined
Jun 13, 2022
Messages
150
Reaction score
181
Location
Alabama
I built a Limited gasser today on RAM without the Mega cab vs the 1500 Limited gasser, the price is about 78,000 2500 to 72,500 for the 1500. I added the same type options (NE, Anti-spin, Trailer tow mirrors, etc.) as my build where I could. Granted, trim level, diesel, rebates, incentives, and other options will make a price difference, no doubt. It is subjective, but for the capabilities of the 2500, it is worth it. I would not be surprised if some other buyers figure it is worth it as well.
Most of us who order/drive the 2500 or 3500 already know we will get lower fuel economy. The ones who are used to the 1500 fuel economy sometimes get a little shocked at the 15mpg highway empty (depending on your drivetrain setup). I had a 3500 SRW diesel before ordering my 2022 3500 DRW HO diesel. I got 11.7 pulling my rig and 20 empty before, I'll be happy if I get the same with my dually when I get it! Just my thoughts.
 

brv10

has the scoop
Joined
Jun 13, 2021
Messages
3,331
Reaction score
7,341
The mirrors are a big one for me as I wasn't able to get power folding and that is annoying on a 60k truck. Also had to get some options that I didn't necessarily want due to ordering constraints. That's why a lot of it hinges on what the options packages look like for 23.
Doubt they will change much due to the current situation, except for 3 changes so far.
 

dscak1

New Member
Joined
Jan 20, 2022
Messages
16
Reaction score
12
In
I see you sitting at El Mirage since 6/27!
Interesting, rail car info shows it left Defiance, NM on 7/2 at 2:57 pm with no ETA. I'm stuck on a runway in Philadelphia right now but will call the dealer tomorrow. I spoke with the area rep for Stellanis on 7/27 and he still reported the Defiance NM info. Thank you for your insight. Will let you know what I find out.
 

Namlehse

Member
Joined
Feb 21, 2022
Messages
17
Reaction score
27
Now to get my tie downs mounted. It’s crazy how much of an upgrade the new truck is.
 

Attachments

  • 0DDBD6D4-0643-4A5E-9204-97161D5EB60A.jpeg
    0DDBD6D4-0643-4A5E-9204-97161D5EB60A.jpeg
    810.2 KB · Views: 43
  • 805E8D0F-AF57-4650-9540-AED659A91453.jpeg
    805E8D0F-AF57-4650-9540-AED659A91453.jpeg
    651.7 KB · Views: 40

QuattroCS

Well-Known Member
Joined
Jan 24, 2022
Messages
633
Reaction score
630
Location
North Florida
Alright Folks, here we go on weekly update ;-), Apologies for the delay
Happy to see some movement on the Build of last year is almost all caught up (10 out of 961 pending, 99.0% complete) 14 Pending Delivery and 4 Pending build (53 canceled orders also play a part in the overall situation)
(942 (924 already delivered + 14 pending delivery + 4 Pending build) is a more realistic number for 2021)


Overall numbers from last week (Pretty good week) with overall completion rates
5 more orders added
17 Built - Overall 95.4% complete total (currently sitting at 69 units left to build) - Rome wasn't built in a day ;-)
10 Delivered - Overall 77.1% complete total (currently sitting at 341 units left to deliver) -69 total canceled orders - this week it was organic movement overall and @brv10 special sauce

More metrics/analysis for the data freaks (completion rates with qtys pending)
2021 - (10 out of 961 pending Build, 99.0% complete), delivery is at 96.6% (33 out of 961 waiting for shipping) - 33 is an amazing number, even more amazing is 54 orders are canceled overall, show show delivered others don't.
Q2-May and June of 2021 are 100% built, delivery is at 98.0% (4 out of 198 waiting for shipping) - the 4 that are not shipped are canceled ordered - 15 total canceled orders- we can now count Q2 2021 100% completed
Q3-July, Aug and Sep of 2021 are almost 100%(99.7% to be exact) Built (only shy 1 out of 375), and delivery is at 98.7% (5 out of 375 waiting for shipping) - 15 orders are canceled so the Build and delivery is much closer than shown
Q4-Oct, Nov and Dec of 2021 Build is at 97.7% (9 out of 388 pending), Delivery starts to rear its ugly head (but its almost there), is at 93.8% (24 out of 388 waiting for shipping) - 24 orders are canceled so the Build and delivery is much closer than shown - should put build at 100% as well and delivery even more complete

2022 - (59 out of 534 pending Build, 89.0% complete), delivery is at 43.3% (303 out of 534 waiting for shipping)
Q1-Jan, Feb and March of 2022, Build is at 95.9% (17 out of 417 pending), Delivery continues with challenges, 50.4% (207 out of 417 waiting for shipping) - 11 orders are canceled so the Build and delivery is much closer than shown
Q2-April, May and June of 2022, Build is at 65.8% (39 out of 114 pending), Delivery is at 18.4% (93 out of 114 waiting for shipping) - 4 orders are canceled so the Build and delivery is much closer than shown
Q3-July of 2022, Build is at 0% (3 out of 3 pending), Delivery is at 0% (3 out of 3 waiting for shipping)

Let me know if any other metrics should/could be evaluated., Red comments are changes in numbers/counts, Green comments are general comments. Yellow comments are unedited/updated passed on from last post. White and no change from last week.

A lot of positive movement this week and little by little getting closer to the finish line. If production line does get reset in October. There are still 2 full months of production. so overall i think the timing is still in play and that MY22 completion is still feasible.


Thank you for the lift again @brv10 and @OfficerDirtySanchez

Screen Shot 2022-08-05 at 15.01.11.png
 

99mo

Active Member
Joined
Feb 7, 2022
Messages
200
Reaction score
234
Location
Missouri
I will check more when I get back from Vacation in a week, Mackinaw City here I come, 70-73 degrees all week!
Spent a few college years in Grand Rapids and Kalamazoo. Farthest north I made it was Traverse City-Bay area. You will be pretty close to the UP. Great time of the year to visit.
 

brv10

has the scoop
Joined
Jun 13, 2021
Messages
3,331
Reaction score
7,341
Spent a few college years in Grand Rapids and Kalamazoo. Farthest north I made it was Traverse City-Bay area. You will be pretty close to the UP. Great time of the year to visit.
Yep, I go to the U.P. a lot in the winter snowmobiling.
 

TRXCNB

Member
Joined
Apr 19, 2022
Messages
84
Reaction score
51
Cou
Mine was 4 months in D status. Then built 1 month later. Then shipped 1 month after that. Est delivery is 1 month after it shipped. We shall see if it hits it or not. Mine was a mid optioned BH, no bsm or sunroof but I think the ramboxes did me in. The rambox was about the only reason I held out and didn't buy one off the lot. Who knows if this thing doesn't show before the 23s are available to order, I may cancel and order one of those.
Could the rambox be why im waiting so long for mine? I added mine by mistake and couldn't change the order... Oh well it looks pretty cool. 100000 truck sad face
 

Users who are viewing this thread

Top