Onelongshot
Active Member
- Joined
- Nov 29, 2020
- Messages
- 134
- Reaction score
- 120
I ordered a 3500 Laramie SRW HO fully loaded with 8’ bed. Ordered on 10/30 been in D1 status since 11/06.It would be interesting to see what trim levels were ordered for those that are experiencing the extended build and ship times. For instance, are the tradesman being delayed for build/shipment with the more expensive (and more profitable) limited trim levels being pushed ahead of the line?
Conversely, are those with long wait times ordering the limited line which requires more parts?
Sent from my Pixel 2 XL using Tapatalk