What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 Ram HD Builds and orders - Post and discuss your TRUCK order here! ** NEW USERS READ POST #1 **

My salesman just sent these pictures a few minutes ago of my truck that was just unloaded on the lot.

For those keeping track:
3500 Bighorn MC 6.7 SO (level B equipment group, pwr folding mirrors, surround view, 8.4" screen, no other tech options or sunroof)
Ordered 7/10
Estimated built date 9/18
Built and shipped within a few days of 9/20
Estimated delivery date 10/8-10/18
Train arrived to Barnes yard in Portland, OR 10/6
Arrived at dealer 10/8
View attachment 23148View attachment 23149View attachment 23150View attachment 23151
Congrats man! Did you order it with running boards? Where can I find the PN for the ones on this photo?
 
My salesman just sent these pictures a few minutes ago of my truck that was just unloaded on the lot.

For those keeping track:
3500 Bighorn MC 6.7 SO (level B equipment group, pwr folding mirrors, surround view, 8.4" screen, no other tech options or sunroof)
Ordered 7/10
Estimated built date 9/18
Built and shipped within a few days of 9/20
Estimated delivery date 10/8-10/18
Train arrived to Barnes yard in Portland, OR 10/6
Arrived at dealer 10/8
View attachment 23148View attachment 23149View attachment 23150View attachment 23151
KZ-X ,congratulations.
 
Since we're talking about rumors....I heard that one of the delays is with the rear air level option....only duallies are being built with rear air...if you don't have the rear air option but picked sunroof....that's another reason for delay....my bff and I both ordered our trucks one after another on 6/15....mines a DRW his is SRW...no sunroof for either of us .....mine is built waiting for a train ride and his is still in D....
 
Since we're talking about rumors....I heard that one of the delays is with the rear air level option....only duallies are being built with rear air...if you don't have the rear air option but picked sunroof....that's another reason for delay....my bff and I both ordered our trucks one after another on 6/15....mines a DRW his is SRW...no sunroof for either of us .....mine is built waiting for a train ride and his is still in D....
I have SRW auto-level no sunroof limited level 1 went D1 today, but my order is 6/11
 
Since we're talking about rumors....I heard that one of the delays is with the rear air level option....only duallies are being built with rear air...if you don't have the rear air option but picked sunroof....that's another reason for delay....my bff and I both ordered our trucks one after another on 6/15....mines a DRW his is SRW...no sunroof for either of us .....mine is built waiting for a train ride and his is still in D....
... and you may be the only person to ever do both - ordering a HD and use the term bff.
 
I couldn’t agree more. The Tech Bulletin was sent out on 10/2 so the dealer, FCA and Uconnect should have known and 1 - updated the truck before i picked it up or 2 hit the database as soon as I reported the problem and they would have seen the TSB!

in all honesty, it was a guy on THiS forum who got me the bulletin number before anyone else!! I then passed it along to the dealer and to FCA. Then, magically the regional Uconnect people called me with the same fix! Coincidence? Probably not!

the dealer has been very attentive to the issue - aside from flashing And searching for a TSB. I have their commitment to unwindnthe Whole deal, give me my trade back if the flash doesn’t work. They don’t have to do that.
Isn't the point of Uconnect5 to push OTA updates?
 
Since we're talking about rumors....I heard that one of the delays is with the rear air level option....only duallies are being built with rear air...if you don't have the rear air option but picked sunroof....that's another reason for delay....my bff and I both ordered our trucks one after another on 6/15....mines a DRW his is SRW...no sunroof for either of us .....mine is built waiting for a train ride and his is still in D....
I have sunroof and rear air on my SRW mega limited HO. It’s built and sitting waiting for a train ride to Louisiana…and I ordered July 16…. Lots of rumours flying about for sure.
 
Hope the fix handles it for trucks built before Oct, I got the same one.
Here are affected vehicles per the TSB:

OVERVIEW:
This bulletin involves inspecting the software level and updating the software if needed. The
software will be updated from S21.8 to S21B.5.
MODELS:
2022 (DJ) RAM 2500 Pickup
2022 (D2) RAM 3500 Pickup
2022 (DD) RAM 3500 Cab Chassis
2022 (DF) RAM 3500 <10K Cab Chassis
2022 (DP) RAM 4500/5500 Cab Chassis
NOTE: This bulletin applies to vehicles within the following markets/countries: North
America and EMEA.
NOTE: This bulletin applies vehicles built on or before October 01, 2021 (MDH 1001XX)
equipped with One of the following radios:
• Uconnect 5 Nav W 8.4” Display (Sales Codes UBL, UEL, UPL or UFL).
• Uconnect 5 Nav W 12” Display (Sales Codes UBQ, UEQ, UPQ or UFQ).
 
Back
Top