Hey guys, did some digging and thought those with 2023 PW orders might find these links interesting:
First, I found this link in the old Gen Disc 2022 Order thread that shows production time tables for Stellantis factories:
Naple Fleet Production Tables
According to this, production on '23 2500's should start next Tuesday (11/1). somewhere buried in the Gen Disc 2023 Order thread this is moved a month out from the original estimated 2023 Production date of 10/1.
Second, I found this spreadsheet that was compiled for 2022 HD truck orders back in early 2021. If you go through the spreadsheet and look at order dates and then delivery dates for the Power Wagons... unfortunately the turnaround times are all very sporadic and unpredictable from what I could tell.
2022 Order Spreadsheet
One obvious trend for Power Wagons and other HD Rams that I found was a simple one: Canadian (or other export orders) all take at least 6 months. This is a given with going through the exporting process, so I didn't really consider any export orders relevant to US PW orders.
I originally thought that the more rare or uncommon the color (Olive Green, Hydro Blue, Delmonico Red, etc), the longer the sequencing and therefore build time would take. This was commonly understood with Dodge orders for Challengers/Chargers for the last few years where the more rare or special the color, the longer the order would take. (From production's standpoint, they're not going to interrupt a sequencing of 25 white or 30 black Challengers to build your purple Hellcat or green R/T). However looking through the spreadsheet this was not the case, as some people with Olive PW orders (verified by window stickers) got their trucks in less than 4 months and some took almost 8 months.
I also looked at equipment to see if there was a trend there for how long build processes take, unfortunately I saw the same result. Fully optioned PW's will sometimes take 2-6 months vs Level 1 w/ black wheels and side steps could also take 2-6 months.
Now from what I could tell (and I'm no data nerd so maybe I'm wrong) it did seem like those who placed orders around early October through December, did seem to in fact get them more commonly in roughly a 2-4 month time frame compared to any other time of the year.
For example, the 5 orders with the
shortest build times I could find (from order date to delivery date) were as follows:
- User: Cmh2007 - Order date: 10/15/21 - Delivery date: 12/27/21 (73 days) - Window Sticker
- User: max31man - Order date: 1018/21 - Delivery date: 12/28/21 (71 days) - Window Sticker
- User: Maui Time - Order date 11/1/21 - Delivery date: 12/31/21 (60 days) - Window Sticker
- User: adamsmith656 - Order date: 12/3/21 - Delivery date: 1/31/21 (59 days!) - Window Sticker
- User: PapaJoe - Order date: 12/8/21 - Delivery Date: 2/4/21 (58 days!) - Window Sticker
There are other orders in between or around these 5 order dates, these were just the shortest deliveries I could find in this time frame (early October to mid December). Other orders placed around this time frame took closer to 3-4 months. But all of the orders from Oct-Dec were still built more quickly than any other time. Looking at window stickers, there's no visible correlation to options or colors as to why these 5 were so quickly built.
Someone more familiar with PW orders may be able to speculate better than I can as to if this timeframe for ordering (Oct-Dec) actually means anything or if these were just luck of the draw situations.