You are on about the same timeframe as me. Ordered Jan 20, Scheduled Feb 13, In production Feb 25, "estimated delivery" June 11. Bah.Ordered 1/23, scheduled 1/30, in production 2/24, estimated delivery 6/10. Ugh...
You are on about the same timeframe as me. Ordered Jan 20, Scheduled Feb 13, In production Feb 25, "estimated delivery" June 11. Bah.Ordered 1/23, scheduled 1/30, in production 2/24, estimated delivery 6/10. Ugh...
That would be good. At this point I really only care that the truck is out of Mexico without a tariff. I think we are safe, but who knows. The Mexico tariff was announced to be back on March 4. 25% on 97k is just not something I am interested. Best of luck to everyone.Perhaps their systems are estimating based on historical timelines/activity? I was told 23 days from D to D1, when I've looked at posts here and have seen 13-15 days. Maybe after the first wave of deliveries it will provide more realistic estimates that are not so far out?
Wow you may be receiving VIN 1 - that was an early order!Thought I’d just put my details in here for those interested in tracking. Ordered 2025 Ram 2500 Laramie Crew 4x4 on Dec 13, scheduled Dec 19, in production Jan 17, Built Feb 23, prepped for shipping and shipping listed TBD. My original delivery date was March 29, then went to TBD, and today shows March 13th and finally today the window sticker showed up.
Hope this helps with some of the waiting anxiety for some of you!
It only took 6 months from when my truck was built to when it was shipped. I could have walked down there from Tucson and picked it up faster.I think whom ever is in charge of delivery dates are just messing with us.
You can plug in your vin and get your build sheet here: https://fcagroup.my.site.com/RAM/s/equipment-listingWhat site are you using to look up your window sticker? I go to Mopar and sign in and see my Equipment list but no window sticker. Mine was built and holding for rail on February 19th.