There is no "right" answer but to give you context mine was ordered 2/4 built 5/19 and sat in mexico for 2 months and has been stuck in shipping ever since. I would estimate 6-9 month wait total. WAY longer if the railroad strike happens.Hey guys and gals, just joined the forum in anticipation of my first MOPAR vehicle, and my 1st HD truck.
Short of reading thru 36k posts on this thread; whats the average time trucks are waiting down at the Mexico plant after they're built, before they get on a train? My 2500 has been waiting since 6/23 (7 weeks) for a ride. It's getting harder and harder to be patient knowing that its built and just baking in the Mexican sun.
Thanks
Sent from my Pixel 6 Pro using Tapatalk