I seem to be an odd one that breaks all theories...If you look at the order sheet, it seems if you ordered a HO diesel, you are going to have a longer wait than either gas or standard diesel. Not sure if it's the HO engine or Aisin that's slowing things down. I ordered an HO Dec 23 and I check in with Ram Chat on a weekly basis and they are still gathering parts with no build date forecast.
3500 Laramie DRW 4x4 HO NE, etc. (lots of things)
Order: 1/5
Window Sticker: 2/5
Was on train a couple days after that.
42 days in, and en route to Port Allen, LA. Unless something silly happens (knock on wood), will have truck < 60 days total time.


