Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
Well here’s mine pretty loaded Laramie level 1 with sunroof, safety group, dual alternators, aux switches, and ram box. Not a limited but I need 6 passenger seating, and didn’t care to go level 2 or F for the 17 speaker Harman Karden system at $1800 extra.
The day you went into production is basically the day it was built. The day it says built is the day that any outside vendor stuff (as in bed liner, steps, bed cover) were completed.
Realistically don’t expect that, there aren’t any on the spreadsheet that went into production on their scheduled date. I did a quick look through the spreadsheet and the one nearest to starting on the scheduled date was 9 days after. There are several around the 14 days after.
I ordered on...
I got a message from my dealer this morning. My truck is in Salt Lake City railyard. I’m only 45 miles away from the final delivery now we wait for a truck to pick it up.
With the Laramie, you can still get 5th wheel prep, but not on the limited. Definitely odd how some of the things are restricted. I ordered a pretty loaded up Laramie because I wanted 6 passenger seating and not the center console. I had to have Laramie to get a mega cab, had to have 3500 for...