2021 Ram HD Builds and orders - Post and discuss your order here!

I have the same accessories. Ram chat advised the truck actually gets shipped to an offsite vendor for installation.
Yea dealership said that might get before January but not holding my breath but when ordered was told 10 to 12 weeks which looks closer to 16 to 20
 
I ordered a BigHorn, 3500 4x4, HO, CCSB on 10 Nov 2020 and its been in D1 status for 3 weeks. To date, not seeing a single 2021 3500 HO build completed on this site, I think I’m going to fall back on the old military slang .....”hurry up and wait.” It’s going to be a long while before I see a window sticker for the truck I ordered.
 
I have the same accessories. Ram chat advised the truck actually gets shipped to an offsite vendor for installation.

I ordered a BigHorn, 3500 4x4, HO, CCSB on 10 Nov 2020 and its been in D1 status for 3 weeks. To date, not seeing a single 2021 3500 HO build completed on this site, I think I’m going to fall back on the old military slang .....”hurry up and wait.” It’s going to be a long while before I see a window sticker for the truck I ordered.
This thread is not very encouraging lol, I am going on 12 weeks now, 3500 HO with bed util group, gooseneck prep group, running boards, but it has been at the offsite vendor for 3 weeks now. Ram chat just said this:
Me (12/12/2020, 2:27:51 PM): is there any shipping delays going on now, any strikes or other hold ups
Ram Chat (12/12/2020, 2:28:16 PM): No, there has not been any reported delays, we are expecting all orders to stay on schedule
 
I ordered a BigHorn, 3500 4x4, HO, CCSB on 10 Nov 2020 and its been in D1 status for 3 weeks. To date, not seeing a single 2021 3500 HO build completed on this site, I think I’m going to fall back on the old military slang .....”hurry up and wait.” It’s going to be a long while before I see a window sticker for the truck I ordered.
I ordered almost the same truck. I will be in D1 status for seven weeks on Monday. Must be some hold up with the 3500 HO combo doesn't seem anyone is progressing with the 2021 builds.
 
I've read both articles, the rail blockades are in Michoacán, and Sonora. Ford stated that they "may" have issues with the Sonora blockades because their (Ford Bronco Sport) Hermosillo plant is in Sonora. Sonora is almost 900 miles west of the Saltillo Ram production facilities. With Saltillo being much closer to Texas, (Hermosillo is near San Diego) it's unlikely that Ram shipments would be effected. Also the Michoacán is much farther south and near Mexico City.

Sure, that is some small % of it. If you do a bit more googling for a few seconds you can quickly read up on blockades/bottlenecks in ports of entry in Texas as well. In addition to it how do you think that steel/parts arrive at the assembly plant? Do you think they only come from 1 direction?

https://texasrailadvocates.org/2020/10/04/mexico-rail-blockades-delaying-shipments-to-and-from-u-s/

"Raquel Espinoza, a spokeswoman for Union Pacific Railroad said the situation has interrupted the railroad company’s operation in El Paso, Texas. Espinoza said “while Union Pacific is rerouting rail traffic through other border crossings, customers are experiencing extended delays and disruptions to critical supply chains.”

The protests are unrelated to any railroad action, which means that rail officials must wait for federal authorities to resolve the issues. The blockades are impacting energy products, steel and grain that move daily in cross-border rail transit"
 
10/13 order

2021 Tradesman crew cab long box
level 2, chrome, snow chief, and off road
8.4 inch screen, 50 gal tank, block heater, power towing mirrors, trailer brake, carpet delete, crystal metallic, hemi gasser
No sidesteps or spray in bedliner

Dealer said it’s off the train! Now it’s last journey is via semi to the dealer hopefully in next 3-5 days!
 
10/13 order
2021 Tradesman crew cab long box
level 2, chrome, snow chief, and off road
8.4 inch screen, 50 gal tank, block heater, towing mirrors,
crystal metallic hemi
No sidesteps or spray in bedliner

Dealer said it’s off the train! Now it’s last journey is via semi to the dealer hopefully in next 3-5 days!
 
10/13 order
2021 Tradesman crew cab long box
level 2, chrome, snow chief, and off road
8.4 inch screen, 50 gal tank, block heater, towing mirrors,
crystal metallic hemi
No sidesteps or spray in bedliner

Dealer said it’s off the train! Now it’s last journey is via semi to the dealer hopefully in next 3-5 days!
What part of the US are you in? both of are trucks where built and shipped on the same day so curious how close mine may be.
 
I ordered a BigHorn, 3500 4x4, HO, CCSB on 10 Nov 2020 and its been in D1 status for 3 weeks. To date, not seeing a single 2021 3500 HO build completed on this site, I think I’m going to fall back on the old military slang .....”hurry up and wait.” It’s going to be a long while before I see a window sticker for the truck I ordered.
You do realize the 2021 HO's got upgrades from the 2020's, correct? I ordered my truck over a month before you, the original build date is 12/16 which is still almost a week away. There's an article, if people would actually read which states HO production to START IN DECEMBER. So it apparently doesn't mean anything that I ordered 10/3. HO production started in December.
 
Is it really still possible to order a 2020? Ram web site seems to say it is, and there's a color I want that has been discontinued for 2021. Anybody know?
 
Is it really still possible to order a 2020? Ram web site seems to say it is, and there's a color I want that has been discontinued for 2021. Anybody know?
Nope all orders would be for 2021 now for sure. If you want a 20 it will have to come off the lot somewhere.
 
So if you can finnaly see your window sticker does that mean it could of or will be shipping?
 
Ordered 10/23
VIN 10/24
Build sheet 12/7
Window sticker 12/11

Power Wagon Olive Green Pearl/Black
75th Anniversary Edition
Dual alternators
Towing technology group
Safety group
Bed utility group
Sunroof

Ram Chat told me this morning to expect delivery to the dealer between 12/21 and 1/4.

I'm curious what the hold up is with some of the other trucks, or if I just got really lucky with timing.
 
You do realize the 2021 HO's got upgrades from the 2020's, correct? I ordered my truck over a month before you, the original build date is 12/16 which is still almost a week away. There's an article, if people would actually read which states HO production to START IN DECEMBER. So it apparently doesn't mean anything that I ordered 10/3. HO production started in December.
Thanks for the information. We're almost half way through December and no HO builds are yet to be seen. Just sayin.
 
Do you have to pay to get the window sticker or is there a free site to get it?
 