Onelongshot
Active Member
- Messages
- 134
- Reaction score
- 120
- Points
- 43
I have been in D1 status since 11/2/2020Your build can be in D1 for a few weeks from what my dealer told me and mine was.
I have been in D1 status since 11/2/2020Your build can be in D1 for a few weeks from what my dealer told me and mine was.
I don't really think the trucks are built in batches of trim levels either. I think a truck order kit is assembled and then it gets in line. Whether its a Tradesman or a Limited the people on the line are able to build any configuration. As a truck rolls by the assembler has the parts for that truck right there and likely a computer screen telling them what to do for that configuration.Wow. I guess maybe my reading was pre-COVID. :/
I don't really think the trucks are built in batches of trim levels either. I think a truck order kit is assembled and then it gets in line. Whether its a Tradesman or a Limited the people on the line are able to build any configuration. As a truck rolls by the assembler has the parts for that truck right there and likely a computer screen telling them what to do for that configuration.
It's possible. Would be great if someone knew a plant worker that could tell us how they do it. I've seen manufacturing done multiple ways, but usually it's grouped by a common element to make logistics easierI don't really think the trucks are built in batches of trim levels either. I think a truck order kit is assembled and then it gets in line. Whether its a Tradesman or a Limited the people on the line are able to build any configuration. As a truck rolls by the assembler has the parts for that truck right there and likely a computer screen telling them what to do for that configuration.
I ordered my Laramie Diesel on 9/25, got the build sheet 11/20 but still no window sticker. Ramchat says it is at the body vendor for 11 days yesterday. Still no ship dateI ordered my 2021 2500 Laramie CCLB Hemi on 9/4, got my build sheet on 11/20. Still no window sticker, been at the body vendor over a week now... Anyone else with an early order date not have a window sticker or estimated ship date yet?
My 3500 Bighorn 4x4 CC HO has been in D1 status since 11 24 2020. I checked this morning and it's still in D1 status.Drose and maybe Onelongshot were in D1 status yesterday which according to what I've read means they're scheduled to be built within the next 48 hours.
It's possible. Would be great if someone knew a plant worker that could tell us how they do it. I've seen manufacturing done multiple ways, but usually it's grouped by a common element to make logistics easier
Took my 20 New Holland Blue 5 1/2 months to get here!That would explain why it took so long for my Olive Green order to be built.
Sent from my iPhone using Tapatalk
I'd think if there were any batching it'd be by chassis length with the benifit being overall length as the main consideration from an efficiency standpoint.I don't really think the trucks are built in batches of trim levels either. I think a truck order kit is assembled and then it gets in line. Whether its a Tradesman or a Limited the people on the line are able to build any configuration. As a truck rolls by the assembler has the parts for that truck right there and likely a computer screen telling them what to do for that configuration.
Wow. I placed my 2020 order on 8/28, received my VIN on 9/28 and picked it up 10/23 (original estimate was 10/26-11/6).I agree there doesn’t seem to be any logic to the build order. My 2020 was ordered near the end of the model order window.
8/18 and still waiting. Not an unusual color or trim, Black Laramie. Window sticker finally on 11/30. Expected in Denver 12/15
It seemed to be stuck in that waiting for optional equipment phase for about 6 weeks.
Mine is also Olive Green and I got a build sheet on Monday for a 10/23 order.That would explain why it took so long for my Olive Green order to be built.
Sent from my iPhone using Tapatalk
2500 Limited ordered on 9/14, build sheet on 11/23, Still no window sticker.I ordered my 2021 2500 Laramie CCLB Hemi on 9/4, got my build sheet on 11/20. Still no window sticker, been at the body vendor over a week now... Anyone else with an early order date not have a window sticker or estimated ship date yet?
2500 Laramie also olive green. Ordered 10/14; build sheet 12/7. Waiting for bed liner, running boards and bed step.Mine is also Olive Green and I got a build sheet on Monday for a 10/23 order.
I'm waiting on the same things. Sounds like maybe they do batch by color, as mine is a PW 75th AE.2500 Laramie also olive green. Ordered 10/14; build sheet 12/7. Waiting for bed liner, running boards and bed step.
What does the D stand for in your status code?Ordered 9/21, JS status 11/19, window sticker 11/24, KZLD status 11/27 and still in that status