What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 Ram HD Builds and orders - Post and discuss your TRUCK order here! ** NEW USERS READ POST #1 **

Both of my orders moved into D1 status today!

3C63R3ML2NG245398 - Ordered 1/12/22 - Laramie/MC/6.7 HO/SRW/Sunroof/Without BS - Anticipated ship date of 5/3/2022
3C63RRJLXNG295277 - Ordered 3/24/22 - Laramie/CC/6.7 HO/DRW/Sunroof/With BS - Anticipated ship date of 5/7/2022

Nice to finally get some progress on the January order and very surprised by the March order
 
Can confirm, the worst part of this wait is when your truck gets to the rail yard and you're waiting for it to get placed on a truck and dropped at the dealership. Mine has been sitting for 10 days and counting and its killing me.
I am at 27 days. If the dude at the transport company actually prioritizes mine, should make the trip to the dealer this week.
 
I am at 27 days. If the dude at the transport company actually prioritizes mine, should make the trip to the dealer this week.
Did you get the transport company info from your dealer? Or another source?
 
New here have been reading along and see many of you are feeling the same why I am and dealing with the same issue....I ordered my mega cab ho dually dec 17 was built march first and hasn't been updated since March 7th with still no ETA. I never got any updates as it went along in the process only from me calling ram. Wasn't sure if any one here could help me and see where I'm at in the process. Last thing ram chat told me was in kz and no update since the last

3C63RRPL2NG227627
Your truck is likely sitting in Mexico waiting to be loaded on a train. Once Ram Chat provides you a dealer ETA, you have probably been loaded onto a train. That would be a good time to contact your dealer for an update. Keep checking with Ram Chat until you get that ETA . . .
 
Both of my orders moved into D1 status today!

3C63R3ML2NG245398 - Ordered 1/12/22 - Laramie/MC/6.7 HO/SRW/Sunroof/Without BS - Anticipated ship date of 5/3/2022
3C63RRJLXNG295277 - Ordered 3/24/22 - Laramie/CC/6.7 HO/DRW/Sunroof/With BS - Anticipated ship date of 5/7/2022

Nice to finally get some progress on the January order and very surprised by the March order
How in the Hell is your 3/24 order already D1 while my LL, 6.7 HO, DRW ordered 2/9 is still sitting at D status?
:(
3C63RRKL9NG270126

Dave…
 
Same situation as a bunch of people it seems ... the truck has been built but still waiting to leave the factory. Seems like something is or has happened at the factory regarding shipping in the last month or two. I am seeing more and more posts asking about trucks built, but not shipping.

Here is my timeline, not the fastest and definitely not the slowest on the tracked sheet.
Order date: 12/4/21
D1 date: 1/10/22
1st estimated build date: 1/30/22
2nd estimated build date: 2/22/22
Equip List date: 2/23/22
Window Sticker: 2/25/22 (shows build date of 2/23)
KZ: 2/25/22
No estimated ship date 30+ days from build date

Again, many have been waiting longer at all stages ... and some were built last week and already on a train. Seems like every step in the process has been a month to 6 weeks for my particular order. If that trend continues, the truck should be catching a train in the next week or two. I am told it takes about 3 weeks to a month once loaded on train until arrival at dealer. So, I'm at 16 weeks with another 4 to go (minimum). Just sharing if it helps.
 
Same situation as a bunch of people it seems ... the truck has been built but still waiting to leave the factory. Seems like something is or has happened at the factory regarding shipping in the last month or two. I am seeing more and more posts asking about trucks built, but not shipping.

Here is my timeline, not the fastest and definitely not the slowest on the tracked sheet.
Order date: 12/4/21
D1 date: 1/10/22
1st estimated build date: 1/30/22
2nd estimated build date: 2/22/22
Equip List date: 2/23/22
Window Sticker: 2/25/22 (shows build date of 2/23)
KZ: 2/25/22
No estimated ship date 30+ days from build date

Again, many have been waiting longer at all stages ... and some were built last week and already on a train. Seems like every step in the process has been a month to 6 weeks for my particular order. If that trend continues, the truck should be catching a train in the next week or two. I am told it takes about 3 weeks to a month once loaded on train until arrival at dealer. So, I'm at 16 weeks with another 4 to go (minimum). Just sharing if it helps.
I'm at 22.5 weeks and waiting on a train. I wonder if they wait till they get enough trucks heading to a particular region of the country and then put them all on the same rail car.

Anybody recently get put on a train heading to Zone 35 Washington? My dealer is in WPA and said the truck will go into Ohio and then to my dealer.
 
Got a dealer update on my truck. Here's what he sent me.

"Just a quick update about truck, everything got moved back on scheduling. So as of now your truck has a tentative ship date of 5/4. I will keep you updated if anything changes."

Not Happy....:confused:.
When was your truck built?
 
View attachment 34765
This is what I got today, my truck was built 3/18, they definitely don’t wanna say much.
"Moving towards you" as in it got pulled out of the plant and is likely sitting in the yard waiting to be loaded on a railcar ;)

When you get an ETA, you're probably loaded.
 
View attachment 34765
This is what I got today, my truck was built 3/18, they definitely don’t wanna say much.
I asked not long after my sticker populated (maybe 2 days) about shipping, and Ram Chat told me my truck was in KANSAS. Funny thing is it actually went JS (3/5) before I got the sticker (3/6), and just left the plant the other day.
 
Signed paperwork with MD today. Truck made it in 12 1/2 weeks. Quoted 18-20 weeks. Paperwork went smooth via zoom and signing online. Was easy to deal with and got a great rate given my less than stellar credit. Very very happy. Now to schedule pickup!! I’m camping in OK an hour north of home all week, and still working. May be next week before I pick up.


Sent from my iPhone using Tapatalk
 
I believe my 3500 is still waiting on a ride south of the border. I'm checking with Ram Chat everyday now. I'm getting the same info as everyone else - built/in shipping stage/no ETA.
 
The LLs seem to take awhile to get to D1. There's a number of us that ordered Oct/Nov that didn't go D1 until Jan.
I'm guessing LL is limited longhorn, I ordered early Nov, still in D status. 3500 Mega SO. Gotta happen soon I'm hoping!
 
Back
Top