Earlier this morning, I was not feeling loved by ordering a Limited. So being bored, early and full of coffee, I went thru the tracking sheet to see if any Limiteds were being built. Here are my findings of vehicles with equipment listings sheets that have been reported to the tracking sheet:
August-1
September-17
October-27
November-36
December to date-10
So yes they are building some Limited's and it seems to be increasing slightly. According to the equipment list dates they seem to come in groups around every 4 weeks +/- for a week at a time. This would make sense in order to have the stock for the assembly line more in line with the orders. These numbers also didn't differentiate between 3/4 or 1 ton or the different engines/options, only tracked for Limited with equipment lists.
Retire and bored make for a long day when waiting on the truck. Like some others, I have to consider cancelling and going with MD. I'm 6 weeks in, but would probably save a couple of thousand more dollars. If it is correct that it would come faster to MD to make up the last 6 weeks, I might have to. I need the truck by the beginning of March for several trips upcoming.