What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 Ram HD Builds and orders - Post and discuss your TRUCK order here! ** NEW USERS READ POST #1 **

Out of all the equipment listings I have found so far and parsed through with some Python (17,587 of them right now) it seems the tech features are potentially a big bottleneck.

I ordered a Laramie with the digital mirror, surround view, trailer surround view, and blindspot monitoring.

None of the window stickers I've found include all of those options on a Laramie. Except for two of the development trucks which are sequence numbers 6 and 129.

It makes me feel a little bit better that while I'm seeing trucks ordered 2 months after mine, there is certainly some logic to it.

I'm trying to make this data available in a spreadsheet so that anyone can filter it and figure out if trucks have been built after their sequence number with all the same options. Just need enough time to do it.
The format of this will probably change as I find a way to automate updating this. I'll probably add some additional columns.

If a row has complete details, that means an equipment listing exists. That's how I can tell if it has the features listed. It's fun to filter for a certain set of features to see what sequence numbers have been built. Enjoy!

 
Just saw this. 1st Laramie I’ve seen done.

If it's done why are they showing pictures of a Tradesman?
They are whores anyways, Market Price Adjustment + $5000.00 on top of MSRP.
 
No Deliveries here, they just take our deposits and lie to us about the status

They aren't lying. They are in the process of gathering parts, it takes at least 8 weeks to gather said parts for any trim other than the top level because those bins are close to the front of the warehouse.
 
They aren't lying. They are in the process of gathering parts, it takes at least 8 weeks to gather said parts for any trim other than the top level because those bins are close to the front of the warehouse.
What's usually the D1 to assembly time frame you thinking?
 
The format of this will probably change as I find a way to automate updating this. I'll probably add some additional columns.

If a row has complete details, that means an equipment listing exists. That's how I can tell if it has the features listed. It's fun to filter for a certain set of features to see what sequence numbers have been built. Enjoy!

I have a lot of blanks next to mine but its pretty much loaded. How do you want to add the options?

2022 2500 LIMITED MEGA CAB 4X4, Packages: 2HM Customer Preferred Package, ETL 6.7L I6 Cummins Turbo Diesel Engine, DG7 6-Spd Automatic 68RFE Transmission, PPX Patriot Blue Pearl Coat, Limited Leather Bucket Seats, SEB Auto Level Rear Air Suspension, MDN Mopar Bed Step - Deployable, DSA Anti-Spin Differential Rear Axle, A69 Limited Level 1 Equipment Group, ASH Night Edition, AHD Heavy Duty Snow Plow Prep Group
 
Last edited:
Well those are the 1st ones I’ve seen that there’s actually a window sticker for, your right they probably don’t have them yet, if they do they have quite a few 2022s. And yeh on that BS adv amount.
If it's done why are they showing pictures of a Tradesman?
They are whores anyways, Market Price Adjustment + $5000.00 on top of MSRP.
 
They aren't lying. They are in the process of gathering parts, it takes at least 8 weeks to gather said parts for any trim other than the top level because those bins are close to the front of the warehouse.
Ah yes the typical 8 week walk from the front of the warehouse to the back and back to the line.... a nice 650 mile long factory.
 
Well I did a thing today. In the market for a 5th wheel toy hauler and only had a 2500 mega cab (yes I know people pull over weight with no problems but consider me mr safety). Decided to look at 3500’s with the high used car market. Local dealer only had Longhorns and didn’t care for the interior. They have been trying to get a quote on a custom build but still waiting on system to be updated. Last night located another local dealer that has a 2022 3500 HO long bed Laramie in transit. Looked at window sticker and noticed it had 95% of what I would have custom ordered. Wasn’t my first choice color (white) but it at least the sport package. Went by dealer today to work out trade in and signed on paperwork. Now waiting for the truck to clear customs and get in the train to Utah.

The big thing it’s missing is blind spot monitor but looks like that can be added afterwards ( will be messaging Jimmy for the harnesses) and the 5th wheel prep ( need to ask dealer on price to install).

Should have the truck in 4 weeks time. Nervous and excited. Thanks for all the help on others messages with their experience in custom building and the mess with new packages due to chip shortages.


Sent from my iPhone using Tapatalk
 
The format of this will probably change as I find a way to automate updating this. I'll probably add some additional columns.

If a row has complete details, that means an equipment listing exists. That's how I can tell if it has the features listed. It's fun to filter for a certain set of features to see what sequence numbers have been built. Enjoy!

Mine is not listed in there ending in 102832

Sent from my SM-G996U using Tapatalk
 
hmmmm that's true in todays world. Wonder if my Est. Ship date will hold true of 10/2
After it leaves the factory and gets on a train it gets easier, those times they give you to the minute usually
 
I have a lot of blanks next to mine but its pretty much loaded. How do you want to add the options?
The list in this sheet is a somewhat separate thing I've been working on. Eventually I'll combine this data with our order tracking sheet. But it's all incremental progress when I have time here and there.

This data makes me feel a little more comfortable with the otherwise strange build sequence we seem to be observing. I can't find another truck built with all my features. On the flip side, it makes me scared about when I'll ever see mine.
 
The format of this will probably change as I find a way to automate updating this. I'll probably add some additional columns.

If a row has complete details, that means an equipment listing exists. That's how I can tell if it has the features listed. It's fun to filter for a certain set of features to see what sequence numbers have been built. Enjoy!


I can’t get it to open


Sent from my iPhone using Tapatalk
 
If it's done why are they showing pictures of a Tradesman?
They are whores anyways, Market Price Adjustment + $5000.00 on top of MSRP.
If they don't have the truck yet the pictures can be generic
 
What all did you get on your truck. I loaded mine up with pretty much everything, but then went and took the air ride off.
The list in this sheet is a somewhat separate thing I've been working on. Eventually I'll combine this data with our order tracking sheet. But it's all incremental progress when I have time here and there.

This data makes me feel a little more comfortable with the otherwise strange build sequence we seem to be observing. I can't find another truck built with all my features. On the flip side, it makes me scared about when I'll ever see mine.
 
I just came across something strange.

I was told that Olive green is not currently available. But I know 2022 Power Wagons do exist in that color. Here is video of one.


So I guess that's something they've removed or quit offering. I don't get it. Seems weird.
My BH 3500 is inbound in olive. Ordered 8-23
 
Back
Top