What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2023 HD Crowdsourced Order Tracking & Waiting Room

No they don't, but from start of production to JB usually takes a couple days.
 
It’s nice to see some progress on 2023’s. Anxiously waiting to trade in my 2019 Laramie 1500 for the 2023 3500 Limited. I’m line 8 on the tracker.
 
Appears I went in production today, estimated delivery of 1/21/23. Would be 14.5 weeks from order to delivery (just under 8 weeks from production start to delivery to comply with the rules), but I'm not holding my breath that date will stick.
 
Last edited:
Good to see some progress on the 2023 builds.. I hope the issue with the chassis cab camera systems will be worked out soon, been trying to order once since July. :(
 
Parsing the xml, looks like my truck status is KZX.


{"statusCode":"KZX","statusDesc":"Delivered","arrivalDate":"","statusUpdateDate":"","display":"N","currentStatus":"N","order":"6"}],"vinDetails":{"brandName":"RAM","modelName":"2500 POWER WAGON CREW CAB 4WD","modelYear":"2023","vin": …
 
Unfortunately, no. "currentStatus" is "N" - so that's not your order status.

"statusCode":"KZX","statusDesc":"Delivered","arrivalDate":"","statusUpdateDate":"","display":"N","currentStatus":"N","order":"6"}
 
Unfortunately, no. "currentStatus" is "N" - so that's not your order status.

"statusCode":"KZX","statusDesc":"Delivered","arrivalDate":"","statusUpdateDate":"","display":"N","currentStatus":"N","order":"6"}

I maybe reading it incorrectly, but previously the statusCode had C, D1, KZ, KZM, and then KZX. The currentStatus field is consistently N.
 
I maybe reading it incorrectly, but previously the statusCode had C, D1, KZ, KZM, and then KZX. The currentStatus field is consistently N.

You should see all 6 status codes in the raw data. One of them will have "currentStatus": "Y". In my data, I'm still in "C"

{
"statusCode": "C",
"statusDesc": "Order Confirmed",
"arrivalDate": "",
"statusUpdateDate": "2022-10-11",
"display": "Y",
"currentStatus": "Y",
"order": "1"
},

Those objects are used to render the visual order status widget in the RAM tracker:

1670276647881.png
 
You should see all 6 status codes in the raw data. One of them will have "currentStatus": "Y". In my data, I'm still in "C"

{
"statusCode": "C",
"statusDesc": "Order Confirmed",
"arrivalDate": "",
"statusUpdateDate": "2022-10-11",
"display": "Y",
"currentStatus": "Y",
"order": "1"
},

Those objects are used to render the visual order status widget in the RAM tracker:

View attachment 48260

Thanks, that helps.
 
The greatest mystery of our generation is how stellantis decides what order a truck is built. I might do my MBA capstone project on it...
For starters, they need at least 10 of 1 color to run them down the line.
 
For starters, they need at least 10 of 1 color to run them down the line.
I have to believe it is not a big deal waiting for 10 of one color seeing in 22 they built 150k HD trucks (based upon the tracking spreadsheet). I would be shocked if they offered a color that fewer then 1% bought which comes to 1500 trucks or 28/week. Just a thought and a wishful hope since the color I picked probably isn’t a high runner.
 
Yep, and it's hard to track due to the high number of trucks ordered outside this group.
 
Back
Top