2022 HD Crowdsourced VIN/Order Tracking

At which point in the build will one usually see an “estimated delivery” date populate on the Ram tracker site?

And I’m guessing that date can be off by days? Weeks? Months?


Sent from my iPhone using Tapatalk
 
At which point in the build will one usually see an “estimated delivery” date populate on the Ram tracker site?

And I’m guessing that date can be off by days? Weeks? Months?


Sent from my iPhone using Tapatalk
Mine showed up in D1, then disappeared, then reappeared as 29 June. Then once built went back to TBD, then once shipped went to 24 June. Hadn't changed since.
 
When I called my dealership to check on the order they were able to see an estimated delivery date, so interesting that the Ram tracker does not show that. I do realize that the estimated delivery date they see is probably nowhere close to accurate… I’m in D1 still and it’s telling them 6/25 lol.


Sent from my iPhone using Tapatalk
 
on all of them? do we know what the intermediate status codes are on the updates?
The source code says something to the effect of..."statusUpdateDate". There is a build code status update thread for all the other codes.
 
on all of them? do we know what the intermediate status codes are on the updates?
That's the catch. There isn't anything the tracker gets that directly indicates what exactly the current status is. This is the entire "orderstatus" section of the data that is returned, the other piece is the vindetails and dealerdetails.

So, the best that can be done is to interpret the data. For example, when going to KZM that section gets it's statusUpdateDate populated, when it gets a different value for statusUpdateDate you are most likely in KZT. It also looks like the section with "currentStatus:Y" and has an "arrivalDate" is used for the estimated delivery. As far as the built block being red until QC is complete, not sure how the browser is using the data to determine that yet but most likely some combination of dates existing or not.

statusCode : C
statusDesc : Order Confirmed
arrivalDate :
statusUpdateDate : 2022-02-02
display : Y
currentStatus : N
order : 1

statusCode : D1
statusDesc : Scheduled
arrivalDate :
statusUpdateDate : 2022-03-10
display : Y
currentStatus : N
order : 2

statusCode : E
statusDesc : In Production
arrivalDate : TBD
statusUpdateDate : 2022-04-23
display : Y
currentStatus : N
order : 3

statusCode : KZ
statusDesc : Vehicle Built
arrivalDate : 2022-06-20
statusUpdateDate : 2022-04-25
display : Y
currentStatus : N
order : 4

statusCode : KZM
statusDesc : Shipped
arrivalDate : 2022-06-20
statusUpdateDate : 2022-05-29
display : Y
currentStatus : Y
order : 5

statusCode : KZX
statusDesc : Delivered
arrivalDate :
statusUpdateDate :
display : Y
currentStatus : N
order : 6
 
As far as the built block being red until QC is complete, not sure how the browser is using the data to determine that yet but most likely some combination of dates existing or not.

statusCode : KZ
statusDesc : Vehicle Built
arrivalDate : 2022-06-20
Because I believe you don't go KZ until QC is done, so they correlate on the tracker. Somebody correct me if I'm wrong though.
 
Well 11 months to the day. While my truck is a lot closer still hasn't made it to the dealer. Last update I got, truck is sitting in Mira Loma CA waiting for a truck ride to the dealer in Lancaster CA about a 2 hours drive. Keeping my fingers crossed it makes it there by the weekend.
 
And it seems that it quietly reports KZT if you're watching close. Your KZM block will go red with a shipped date, then it will simply update the shipped date when it goes KZT. This is based on observations from the past week or so and some chatter on here. I'm curiously watching if that date shifts again when it arrives in Port, before going KZX.
This is what I think I saw, and what prompted my question.

I happened to check the order status page Monday night, and it did not have a populated shipped block or shipped date, but did have an ETA (Jul 3rd, fwiw). Then yesterday morning it had a filled shipped date with a date of Jun 2nd and no ETA.

My dealer still shows a KZOA status on their end, but the alt txt also shows that the status was last updated on Jun 3rd.

Since the order tracker changed state between Jun 6th and Jun 7th, I wondered if it's possibly ahead of the dealer view.
 
Last update, tracker finally says delivered. 7 days after it arrived at the dealership. It even has 6/1 listed as delivered date yet wasnt updated until this morning. I would make sure your dealer has your number because they will let you know it showed up well before tracker does.
 
  • Like
Reactions: CFE
Some dates for the tracking workbook:

Line 1269 (Derp)

Ordered: 2/28
D1: 4/27
Estimated Ship Date: 6/1
F status: 5/30
KZOA: 6/6 (updated 6/3)

Order Tracker details:
Scheduled: 4/26
In-Prod: 5/28
Vehicle Built: 6/2 (updated 6/6)
Shipped: 6/2 (updated 6/7)
Delivery: 7/3 (updated 6/6) now TBD (updated 6/7)

Zone 63 Dallas
Denton Chrysler Dodge Jeep Ram
 