What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 HD Crowdsourced VIN/Order Tracking

Spoke with Ramchat and dealer again. Both are on the same page saying the delays with shipping seem to be finding place on trains. Maybe it’s true, maybe it’s a lie to appease me. Either at this point wouldn’t surprise me, but for those in the same boat as me (truck built feb 17 but still not shipped) MAYBE that is why.
Someone else posted that their dealer mentioned problems with finding rail cars to ship them. This seems in line with that comment. Seems like getting a train ride is a lottery just like going D1.
 
This is a bummer—reached out to RAM Chat and received this:

“Thank you for holding. I show there are updates pending on your order that will need to be reviewed and discussed directly with your ordering dealership. As such, I would recommend reaching out to your sales team at your selling dealership to review your order further.”

Line 1151, MD order. Hopefully Renae can provide some more details.


Sent from my iPhone using Tapatalk

My mistake—I didn’t know the VIN I received was for the first order. I canceled and reordered within a couple of days of each other. Added correct VIN to tracker.


Sent from my iPhone using Tapatalk
 
I’m so happy for you. And so jealous . I ordered a Laramie Hemi on 1/28 and it’s still D1


Sent from my iPhone using Tapatalk
Thanks, it caught me off guard... I was expecting another couple months for a build. Fingers crossed shipping goes alright. The wife said I probly bothered ram chat to much so they built it so I would leave them alone. Lol
 
Truck built and rolled out of the factory on 2/17. Been sitting in KZLD since then, hoping for a phone call or email with good news any day now.
I'm also kzld I'm not sure what it means
 
The sequence sheet has gotten too large for Excel/Google :) I'm half tempted to load it into a Database but realize this micro obsession is getting a little much ;) I have a Data Science summer student starting in a few weeks.. I'm really tempted..
I did a quick back of the napkin calculation from the large sequence sheet.

-4467 PWs ordered, 1008 left to be built (22%)
-~195k total VINs, ~47k left to be built (24%)
 
Just got a update from my dealer that my truck has been built and released from the plant.

Line 916 on the order tracking

Ordered 12/28, D1 3/21

3500, DRW, Limited, 6.7 HO, Mega


I'm starting to think this may actually happen.
 
5/5/22 est ship date
I’m guessing that’s when the next batch of Timberline Green trucks will be ready to spray
 
@OfficerDirtySanchez - window sticker came last night. Line 1070

My truck was built in April Fools Day. Crazy. I guess it’s better than being built on Cinco


42a586c30a30d527108a212087ebcaa2.jpg



Sent from my iPhone using Tapatalk
 
Just got my window sticker!

Ordered 3/3/22, D1 3/9/22, built 4/1/22. Still in JB status I believe. Getting the bed liner and steps.

Wow - that was really fast. Mine was ordered 1/28, built 4/1. Also waiting for bed liner and steps.


Sent from my iPhone using Tapatalk
 
@OfficerDirtySanchez - window sticker came last night. Line 1070

My truck was built in April Fools Day. Crazy. I guess it’s better than being built on Cinco


42a586c30a30d527108a212087ebcaa2.jpg
Screen Shot 2022-04-03 at 8.17.06 PM.png


Sent from my iPhone using Tapatalk

Updating with a better copy of the window sticker. For anyone who doesn't know, I figured out that the small 4 digit code at the end of the line above the bar code is the date of manufacture. In my case, 0401 (2022).
 
Back
Top