Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
I ordered 10/30/20 and the truck was built 1/17 and shipped 1/19. I took delivery in the Saint Louis Mo area on 2/25. Total of 17weeks. I was in D1 status for over 8 weeks. I can feel your pain.
Mine was built on the 17th of January and shipped on the 18th. I had spray bed liner, power bed steps, bed cover, and 5th wheel prep that had to be done. In that one day and it all got done.
Just got the call from the dealer. Just showed up on the lot via truck. So I pick it up tomorrow morning. Can’t wait. Been a long journey.
10/30 order and VON
11/2 VIN issued
11/6 D1 status
1/17 truck built and build sheet available later that day
1/18 shipping label/ window sticker
2/24...
Just got the word that if everything goes well I should take delivery Wednesday night.
The dealer will be able to pick it up from the yard tomorrow late afternoon.
They will build your truck 1-3 days before the estimated ship date. If you have accessories to be installed it may delay that date. Then you will wait for the train. It is all about timing. It could 1-2 weeks five fire the train leaves or the next day.
I ordered on 10/30 estimated ship date...
My ship date changed 3 times. I ordered 10/30 and mine was built 1/17 and shipped 1/18. My truck is sitting at the rail yard right now 25 miles from the dealership, but it has one more stop to another rail yard about 15 minutes from the dealership before they can pick it up. Maybe by middle...