Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
Just got word the truck arrived at Port Allen already. Spoke to MD and they think it could show up as early as Monday. Things went extremely quick once it finally went into production
Tracker updated this morning with an estimated delivery date but still shows TBD for shipping even though I know it was in Laredo, TX on Monday haha. It's hilarious how bad the tracker is
Woke up to the in production text on Wednesday and was able to generate build sheet late morning. Tracker showed estimated delivery of September and then updated to built yesterday with delivery TBD. It's currently KZ LD, hoping it's not too long of a wait to get to MD. No window sticker...
Seems like a lot of orders go into production in 10-17 days, obviously a lot that don't fit in the window but seems like that's probably close to average at least from everything I've looked at for 24 and 25
In similar situation, order confirmed 5/6 but yet to be scheduled. 3500 6.7 Laramie CC SRW, granite, level 2, towing tech, 5th wheel prep, night edition, aux switches, deleted bed step and rear air
Ordered a 3500 SRW Laramie on Monday, received confirmation and VIN on Wednesday morning. First factory order, gonna be a long wait.
Level 2Plus
Night
Tow Tech Group
Rear Air
Aux switches
5th wheel prep
Looking to put a set of 295/70/18 on 18x9 +20 Fuel Blitz, trying to decide which AT tire to go with. Don't do any off-road driving but good snow performance is a must and occasional towing, nothing super heavy. I love my current set of OEM size Wildpeaks but with the A/T4W being a heavier tire...