Perhaps 3/17 was a good day to order!
3/17 - ordered 2500 CCSB gasser, Laramie Level B, Safety Group B (No BSM), Off-road, Power running boards, Ram-box, spray in liner.
3/17 - VIN + VON
3/17 - D status
4/19 - Build Sheet
4/21 - Window Sticker, ready to ship per dealer.
ETD to dealer was week of 5/13 (to Colorado), might get here on schedule.
Perhaps production is picking up?
I noticed on my build sheet that Special Scheduling Condition VII is listed. Seems that can indicate either accelerated or delayed production. In my case it seems to have sped things up.