IFF you grab each page and stuff into a plain text file and work with that info...
Doesn't look like everyone puts their "ordered" date into signature, would be easier if everyone did...
Then could stamp names and ordered into db and match names to text comment where "ship" or "delivery" shows up in any of their text posts...
But if they quote someone else, it gets much harder to determine start/end of quoted person...
Where does quoted person statement stop and new comment start... tough! Break 'em apart with /r or /n? tough!
Looks to be mostly manual sorting and entering data... Nope not me...
ex.
-name- said:
I ordered on the same day and I believe my estimated ship date is the 24th. I'm not going to worry about it until the 24th or so. I believe they build it a day or two before shipping, so we still have a chance!
You are correct they will build the truck 1-3 days before your estimated ship date.
Ordered 09/30/20. 2021 2500 SRW CCLB Laramie. HO/Aisin, Air Ride, all tech no sunroof
Current 2018 3500 DRW Laramie Loaded
That's same color as 3500 Laramie I'm waiting on. Can't wait!!View attachment 12192 Taking it home tomorrow after a 21 week wait.. ...
Bloomer, please post more pics...View attachment 12192 Taking it home tomorrow after a 21 week wait.. ...
Finally picked up my 3500 limited last week.
Ordered 28 Nov, delivered 10 Feb
Last week I was told my build date was 3/19/21, and I ordered on 2/4/21. So it sounds like we're on a very similar timeline.From my dealer, today
I have some updated news on my end. Your build is in “D1” status. Which means it has a scheduled build date (they don’t give that to me of course). They are showing an estimated shipping date of 03/19/21. Hopefully they will honor that.
I ordered on 2/3/21
That would be great, wouldn't it... 6-7 weeks total until shippingLast week I was told my build date was 3/19/21, and I ordered on 2/4/21. So it sounds like we're on a very similar timeline.
I saw a handful of people saying their trucks got built a few days to a week before the build date. That would REALLY be something. I'd love to have my truck sometime early April, but I don't want to get too hopeful.That would be great, wouldn't it... 6-7 weeks total until shipping
I'm still driving my 2001 Laramie around (200k miles) , so I am most anxious..I saw a handful of people saying their trucks got built a few days to a week before the build date. That would REALLY be something. I'd love to have my truck sometime early April, but I don't want to get too hopeful.
I sold my 1998 24V before ordering, so now I'm driving around my stripped out race car until the truck gets here!I'm still driving my 2001 Laramie around (200k miles) , so I am most anxious..![]()
Good stuff, JL. My '01 diesel has never let me down. Gonna be putting it up for sale closer to ship date on the new Big Horn.I sold my 1998 24V before ordering, so now I'm driving around my stripped out race car until the truck gets here!
Oh I think it should. Great Choice!View attachment 12311
Patriot blues ftw. Hoping the Patriot Blue matches my trailer ! If not, oh well. lol
From my dealer, today
I have some updated news on my end. Your build is in “D1” status. Which means it has a scheduled build date (they don’t give that to me of course). They are showing an estimated shipping date of 03/19/21. Hopefully they will honor that.
I ordered on 2/3/21
Last week I was told my build date was 3/19/21, and I ordered on 2/4/21. So it sounds like we're on a very similar timeline.
They will build your truck 1-3 days before the estimated ship date. If you have accessories to be installed it may delay that date. Then you will wait for the train. It is all about timing. It could 1-2 weeks five fire the train leaves or the next day.I saw a handful of people saying their trucks got built a few days to a week before the build date. That would REALLY be something. I'd love to have my truck sometime early April, but I don't want to get too hopeful.
Appreciate that information! I'm sure its frustrating for your's to be on a 'slow train'.They will build your truck 1-3 days before the estimated ship date. If you have accessories to be installed it may delay that date. Then you will wait for the train. It is all about timing. It could 1-2 weeks five fire the train leaves or the next day.
I ordered on 10/30 estimated ship date of 1/19 and the truck was built on 1/17 and shipped on 1/18. As of right now I still do not have my truck in my possession. It is at the connecting rail yard 16 miles from my house heading to the offloading rail yard. So I might get mine before the end of the month.
good luck guys. I hope you have a quick turn around.
Are you here with the Coast Guard? I'm in Kodiak as well. Beautiful here, but a nightmare to coordinate things like getting a vehicle, or trailer (which we did last year). Really hoping my order arrives in time for our PCS move back to North Carolina.Mine took about a week from when it got to Seattle to Anchorage. Matson is pretty good about sticking to a schedule. I'm waiting for mine to get on the boat again from Anchorage to Kodiak.
I am right behind ya....Ordered 2/6/21 with a build date of 3/27/21.Ordered on 2.8.21, VIN number as of today 2.22.21 with a build date of 3.26.21