Today reached out to Anthony to see what my “scheduled” date was — and the computer said build NLT 16 march and 3 or so weeks for shipping to mark ram.After mourning my 2009 ram 1500 with 296k miles breaking bad enough that it wasn’t smart to repair the first week of Feb, Ordered through mark ram on Feb 10.
3500 SRW CC 4x4
Laramie L2+
Night edition
Gooseneck prep
Towing tech group
Digital rear view +aux cam
50 gal tank
Cold wx package
Transfer case skid plate
Air suspension
Dual alternators
Clearance lights
Aux switches
I think where you ordered from plays a huge part in the shipping wait times. My times are below. Currently still sitting at the Port of Altamira waiting for a boat since Feb 6th. I was told this stage takes normally 2 months. I live in NJ but purchased from dealer south of Baltimore. Good luck!2026 Rebel 2500, ordered Feb 19th, in production Feb 26. We’ll see how long it sits waiting for a ship. It went right from “Ordered” to “In Production”, “Scheduled” still says “TBD”. Hopefully that isn’t just a glitch!
the pic with the transforce tires is stock height the other one is 2" bds lift and 35sLooks stock height so no lift? Any rubbing? TIA.
For anyone curious on current timelines - and I'm sure it varies quite a bit based on who knows what, but my updates are as follows:Just ordered yesterday through Mark Dodge thanks to the recommendations on this forum. 11% off MSRP, my local dealer I've gotten my last 6 vehicles from look at the deal and told me he wished me luck. 2500 Limited 4x4 crew cab 6'4" bed, Hemi, ceramic gray night edition. Pretty much every option available w/ the gasser: Clearance lamps, aux switches, onboard power, sunroof, 4.10 gears, tow-mode wired camera, VSIM, off-road package, ram box delete. Never really wanted a truck per se, but the inevitable upgrade to our next larger travel trailer makes this a necessity. I was told 2 - 4 months - I really, really hope it's more in line with 3 months, as my current lease has to go back 6/1. Now for the waiting game!
That is crazy fast. Congrats!For anyone curious on current timelines - and I'm sure it varies quite a bit based on who knows what, but my updates are as follows:
Ordered 2/16
Scheduled 2/17
In Production 2/24
Built 2/26
Shipped 2/26
ETA to dealer will be before end of March, I won't be able to complete the purchase until mid-April. Way faster than anticipated!
Delivered today, 3/2. 31 days since placing the order.Ordered with Mark Dodge Jan 31st. 2500 Laramie Mega Cab, 4x4, 6.7l, Level 2+, Night Edition.
That's insane. My truck almost spent more time sitting in the port.Delivered today, 3/2. 31 days since placing the order.