SolidAxleorBust
Well-Known Member
He has internal, dealer order sheets/ system. The build and price should be updated by the time 2026 orders are open 
You are correct, at least currently.It seems that there is no way to get the CHMSL bed camera (LPD) or dual zone auto climate control (HAF) without the 12” screen. Is there a way around this? I’m looking at a 3500 SRW Lvl 2 Big Horn and was really excited that it still had the smaller screen. FWIW, I think the bed camera should be part of 5th wheel/GN prep group.
Which truck@AnthonyRI
On the website builder, I've discovered that you can add both OffRoad Package and Air Suspension. Can you confirm that this is accurate? I'm surprised as I'm certain that wasn't possible to combine in prior years.
Thanks!
CANNOT combine Offroad & Air on 2500 Limited Crew, sorry!Ram 2500 Limited Crew Cab
4x4
Deisel
Now things have settled in.... and it appears that simply the air suspension was removed from MAX tow and listed separately, but when I hit air suspension it requires dually and max tow.THE GOOD NEWS IS THAT SRW AIR SUSPENSION APPEARS IN CODE GUIDES - will do a deeper look over next few days, just saw it populate tonight when I was setting up an order!!!
EDIT - Spoke too soon
Too soon to tell, but they have started production. Orders opened in November, but production started in January, so it's hard to tell the staging between order to build if placed once the machine is moving.What is the estimated turnaround time for a Laramie 3500 srw?
No.Does anyone know when the Ram 3500 or 2500 regular cab bighorn 4x4 with a gas engine will be available to order?
You cannot.@AnthonyRI Hey Anthony, do you know if it is possible to delete the GLOBAL TELEMATICS BOX MODULE from a build on the 3500's? I am purchasing mine outright, so I don't want them tracking me. lol
Only one way to do that and not a button I can click LOLYou cannot.
This is actually wild info ! Thank you for sharing an inside view of operationsToo soon to tell, but they have started production. Orders opened in November, but production started in January, so it's hard to tell the staging between order to build if placed once the machine is moving.
ALSO sometimes they hold vehicles in containment at very first production, for extra testing/verification etc before release. So it won't be until later in year when we can REALLY see a track record an average data points.
All that being said, they are building!
I wonder if the wiring will still be in the wiring harness to back of the truck of all the trim levels that it is suppose to be available on so you could add it later.Any details on the onboard power system/2.2 inverter, other than late availability?