Found this online. Hoping it means waiting to get unloaded .Latest info from Union Pacific is “constructively placed” what the hell does that mean? @brv10.
2022 Ram 3500 SRW Limited Longhorn. 6.7 HO Pearl white.
(Don’t have it yet)
Also I have a new code on my build sheet 4UQ Description T3AC cost $125.00 and the YHE removed (extra gas charge of $12.00) maybe they want $125.00 now for fuel...
Found this online. Hoping it means waiting to get unloaded .
Constructive Placement
When, due to some inability on the part of the consignor or consignee, a car cannot be placed for loading or unloading at a point previously designated by the consignor or consignee it is placed elsewhere. It is then considered as being under Constructive Placement and subject to demurrage, rules and charges, the same as if it were actually placed at the designated point.
)Looks like I'm "KZLD – Departing Mixing Yard" anyone know what this means. Dealer still has no shipping date nor does RamChat.What is the current status code? He should be able to tell you that.
Sounds like headed to be loaded on a train.Looks like I'm "KZLD – Departing Mixing Yard" anyone know what this means. Dealer still has no shipping date nor does RamChat.
An August order! They really tested your patience.View attachment 35710
After 7.5 long months of waiting, we finally took delivery of this beauty about an hour ago!![]()
Mine was KZLD for about 2-3 weeks before going KZ for about another week or two, before actually shipping.Looks like I'm "KZLD – Departing Mixing Yard" anyone know what this means. Dealer still has no shipping date nor does RamChat.
Think we got a change in status this morningReading that again, it sounds like the designated yard was full so it was parked elsewhere until it could be unloaded at original yard.
2022 Ram 3500 SRW Limited Longhorn. 6.7 HO Pearl white.
(Don’t have it yet)
Think we got a change in status this morning
)