What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 Ram HD Builds and orders - Post and discuss your TRUCK order here! ** NEW USERS READ POST #1 **

Well I finally see progress. Got my window sticker today from Cryptostickers. At least I know it exists. Probably another month before it gets to the dealer. Might as well make it a full 7 months order to delivery.
 
I suppose you need to be in KZM to even have a train to track. But how do you track BNSF cars?
I live in Victoria, TX. I see trains carrying vehicles in cage cars all the time here. I wonder if this is a hub/stop between Mexico and Lake Charles, La. If so, my truck will pass within a few miles of my house at the half way point of it's journey from plant to dealer.
I have a long wait to go though, just ordered a couple weeks ago.
I am in Victoria tx also… All of my orders usually get offloaded at the border then get loaded back on rail to Houston.. carrier picks truck up at railyard by Hobby then delivers. Another member I know here in Victoria just had his truck delivered by truck carrier directly from the plant… they are getting creative lol..
 
I am in Victoria tx also… All of my orders usually get offloaded at the border then get loaded back on rail to Houston.. carrier picks truck up at railyard by Hobby then delivers. Another member I know here in Victoria just had his truck delivered by truck carrier directly from the plant… they are getting creative lol..
Shoot as long as its delivered. They can use a donky and 2 wheeled cart. At times I think that may be fasting then by the Iron horse.
 
@brv10 or anyone else in the know. Based on what RamChat told me a week or two ago the spreadsheet noted a D1 date for my truck, but I really kinda doubt it.
Today I got the typical
'I am showing that at this time all of the materials needed to start the build process have been received. The vehicle should be entering the build process soon.' and no build date they could give me.

Or maybe I'm misunderstanding what the build codes mean.

3C63R3FJ2NG192875

Thanks
Grizz
 
@brv10 or anyone else in the know. Based on what RamChat told me a week or two ago the spreadsheet noted a D1 date for my truck, but I really kinda doubt it.
Today I got the typical
'I am showing that at this time all of the materials needed to start the build process have been received. The vehicle should be entering the build process soon.' and no build date they could give me.

Or maybe I'm misunderstanding what the build codes mean.

3C63R3FJ2NG192875

Thanks
Grizz
That sounds like D1. But I'd check with your dealer. See what an updated POC says.
 
That sounds like D1. But I'd check with your dealer. See what an updated POC says.

I did, and he didn't give me the build status code or copy of the updated POC, he just told me 'it's gone as far as it can without actually getting built'

If it is D1, as I understand it there should be a build date assigned and projected shipping date. Not that I would put much stock in those dates, but it would be fun to know them.
 
I did, and he didn't give me the build status code or copy of the updated POC, he just told me 'it's gone as far as it can without actually getting built'

If it is D1, as I understand it there should be a build date assigned and projected shipping date. Not that I would put much stock in those dates, but it would be fun to know them.

Been confirmed, D1. No clue how I jumped to the front of the line. My apologies to those who have been waiting much much longer than I have.
 
Sure haven’t been very many Laramie Drw built yet. Hopefully they start soon. Checked with Ramchat and was told all parts gathered but no build date yet, although my selling dealer is saying 11/29. Hope that happens.
 
Sure haven’t been very many Laramie Drw built yet. Hopefully they start soon. Checked with Ramchat and was told all parts gathered but no build date yet, although my selling dealer is saying 11/29. Hope that happens.
Mine is built and is waiting on a truck from the port to the dealership
 
How long does it typically take for build to get to D or D1?

My trucks info for reference. This is by no means the standard. Times are all over the place.
5229ceae1231a9c97cd198ec5abde598.jpg



Sent from my iPhone using Tapatalk
 
Back
Top