I posted this on the Crowdsourced VIN page but thought it might be of interest here regarding early orders which seem to be in black hole. On the plus side 60+% of the orders on the Spreadsheet placed before August have Equipment Lists and Window Stickers and they seem to be coming up to speed so hopefully the list below should shrink more soon. Best to all, Ed
Breakdown as of 11/7 evening of early (May/June) orders without Equipment List is mostly 2500, then 3500 SRW, then DRW, and within the 3500, the HO Diesel is significant (24 of 33 3500s)
May Orders with NO Eq List : 13 2500, 6 3500 SRW, 2 3500 DRW
June Orders with NO Eq List : 20 2500, 21 3500 SRW, 4 3500 DRW, 1 5500
May Orders with NO Eq List : 2 Tradesman, 4 BigHorn, 15 Laramie
June Orders with NO Eq List : 1 SLT ChassisCab, 3 Tradesman, 1 Power Wagon, 22 Laramie, 1 Longhorn, 16 Limited
May Orders with NO Eq List : 15 CrewCabs, 5 MegaCabs, 1 Unspecified
June Orders with NO Eq List : 32 CrewCabs, 16 MegaCabs, 1 ChassisCab
May Orders with NO Eq List : 4 Hemi, 12 Diesel, 3 HO Diesel, 2 Unspecified
June Orders with NO Eq List : 13 Hemi, 14 Diesel, 21 HO Diesel, 1 Unspecified