Andersen24
Well-Known Member
Hello all!
Long story short, after my 2005 bullet proofed 6.0 F-250 left me stranded last week, figured now was the time to pull the trigger on a 2022 Power Wagon. Placed the order today, and pretty much have every option added to it. The build pics are below. They say 6-8 weeks, but as long as it isn’t 6-8 months, I’ll be happy! Looking forward to the info I can gather from the forum!



Long story short, after my 2005 bullet proofed 6.0 F-250 left me stranded last week, figured now was the time to pull the trigger on a 2022 Power Wagon. Placed the order today, and pretty much have every option added to it. The build pics are below. They say 6-8 weeks, but as long as it isn’t 6-8 months, I’ll be happy! Looking forward to the info I can gather from the forum!


