What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 Ram HD Builds and orders - Post and discuss your TRUCK order here! ** NEW USERS READ POST #1 **

What did you order ? Mine hit D1 3/22/22 then has regressed to D back and forth 4 times now according to my dealer ! Has had two build dates that have come and gone very frustrating. But since you been waiting since December I won’t complain so much!

I ordered a 3500 HO with a sunroof. Night Edition.

My truck went D1 on 4/27 and the dealer updated me with a delivery window after that.

As far as I know, it is still on D1 status. No built date just yet.

Yep. I am waiting since December
 
I ordered a 3500 HO with a sunroof. Night Edition.

My truck went D1 on 4/27 and the dealer updated me with a delivery window after that.

As far as I know, it is still on D1 status. No built date just yet.

Yep. I am waiting since December
I ordered a Laramie megacab 3500 night edition with sun roof dealer said 3-4 months max LOL .
 
Crypto stickers says I have a build sheet. But I can't view it. Just a blank sheet saying no data with that vin. Maybe it'll show up after work today?

3C63RRPL2NG231127
 
Alright, which one of you broke the bank!?

55c7b4f2514103c18458fc5219ff7239.jpg



Sent from my iPhone using Tapatalk
Amazing how the sun makes the truck look like it has two different painted sections. Starting from the back of the rear door heading towards the rear bumper it looks darker.
 
Aren't you just a ray of sunshine...
I guess I'm lucky .... my POC and final Window Sticker were spot on despite a six month wait and a significant price increase for the trucks in general.
 
Amazing how the sun makes the truck look like it has two different painted sections. Starting from the back of the rear door heading towards the rear bumper it looks darker.
That's because the front is dirty and the rear was washed by the company that did the stretch, I saw the post on Facebook and the owner explained why it looks like that
 
Keep it Civil
I guess I'm lucky .... my POC and final Window Sticker were spot on despite a six month wait and a significant price increase for the trucks in general.
I'm really not sure what you're getting at? My dealer is honoring the price so there's no stress there, I was simply asking if anyone else had noticed the sticker showing different. You should go back to figuring out how to turn off your headlights...
 
I'm really not sure what you're getting at? My dealer is honoring the price so there's no stress there, I was simply asking if anyone else had noticed the sticker showing different. You should go back to figuring out how to turn off your headlights...
Clearly I misunderstood the gist of your post ..... but you don't have to be a jerk about it.
 
This was posted as restraint issues for June Builds that was sent to dealers in April. Any change or update to the list?

Mopar Options: Avoid these wherever possible. Increases ship time, delays, and is subject to more parts shortages.
Sunroof (all models): Avoid sunroof on all models.
Slush mats: Due to an industry wide shortage, please avoid Slush Mats on all models.
NOTE: As we progress through scheduling options may be added to this list.

Ram HD
• ASH - Night Edition
• XAN - Blind Spot & Cross Path Detection (Orders held in BG where optional)
• GWA – Sunroof
• AAN – Towing tech group
• NH3 – Adaptive cruise control (AAU, AAV, A69 on limited
• AAV – Safety Group
• -XT – Black cattle tan interior
• MDN – Mopar Step
• MY7 – Power deployable running boards
• ANT – Bed utility group
• CKJ – Black Vinyl Flooring
• CFN - 60/40 Folding rear seat (all trims Laramie and higher)
• XML/XNH Mopar 5th Wheel Hitch
• AHU – 5
th wheel prep group
• XB9 – Ram Box
• JVK – 115V Outlet on Tradesman and Big Horn
• APD – 2 tone paint
I'm in rough shape then o_O

Ram HD
• ASH - Night Edition
• NH3 – Adaptive cruise control (AAU, AAV, A69 on limited
• AAV – Safety Group
• ANT – Bed utility group
• XB9 – Ram Box
• JVK – 115V Outlet on Tradesman and Big Horn
 
Alright, which one of you broke the bank!?

55c7b4f2514103c18458fc5219ff7239.jpg



Sent from my iPhone using Tapatalk
I thought megacab forced short bed? That is a long puppy, mega with short is 250" IIRC, that has to be 270" or so 22.5 feet. That's huge, but so good looking, and it probably means they have the 50 gal tank from the factoria. nice

caught the response that it was worked on after. still nice.
 
Crypto stickers says I have a build sheet. But I can't view it. Just a blank sheet saying no data with that vin. Maybe it'll show up after work today?

3C63RRPL2NG231127
It’s an error. You won’t get a window sticker till the truck is built. Your dealer will probably be able to give you ship date if you are D1
 
Finally, after 3 slips on 3 banana peels causing later dates on my build, the truck is officially built and in paint as of today!!! SA-WEET!!!

Ordered: 3/10/2022
VIN: 3/14/2022
D: 3/17/2022
D1: 3/25/2022
1st Est Build Date: 4/26/2022
2nd Est Build Date: 5/2/2022
3rd Est Build Date: 5/15/2022
Built: 5/19/2022

And the ball continues to roll down the hill :cool: I'm sure there will be some more up hills where it come to a stop or at least lose momentum.
 
Last edited:
I'm in rough shape then o_O

Ram HD
• ASH - Night Edition
• NH3 – Adaptive cruise control (AAU, AAV, A69 on limited
• AAV – Safety Group
• ANT – Bed utility group
• XB9 – Ram Box
• JVK – 115V Outlet on Tradesman and Big Horn
Maybe we both are. We will see. I am a probable early June build. That post is over a month old. There might be some updates to it.
 
Maybe we both are. We will see. I am a probable early June build. That post is over a month old. There might be some updates to it.
I'm 13 days from D and placing order, so as suggested, I am pulling up a chair, sitting back and enjoying the scenery ;). And that is OK. Dont have an immediate need and am willing to wait. Plenty of other things to do.1st dealer gave alot of running around and only MSRP pricing, with help in forum, i canceled and went somewhere, i started this process back in January or February. Final order was May. ¯\_(ツ)_/¯
 
All good here too. Watching the EL and builds, it does not seem to follow a consistent pattern. Good you found a cheaper dealer. I really think the folks that have been waiting for many months or their rig is “lost” somewhere in the system should be taken care of first.
 
The sales rep texted me this morning, I always ask for an update. I thought it had moved to D1 or something but still D.

--CANADA BUILD WEEKLY UPDATE--
Ram 3500 4x4 SRW MC Limited NE - Cummins HO - Air Suspension - Level 1 Group

BA - 12/20/21 (Initial Order Date)
BG - 1/4/22
BX - 1/13/22
BX - 1/20/22
BG - 1/27/22
BG - 2/3/22
BG - 2/10/22
BG - 2/17/22
BG - 2/26/22
BG - 3/3/22
BG - 3/10/22
BG - 3/18/22
BG - 3/24/22
BG - 3/31/22
BG - 4/7/22
BG - 4/14/22
BX - 4/21/22
BG - 4/28/22
D - 5/5/22
D - 5/12/22
D - 5/19/22
 
Back
Top