What's new
Ram Heavy Duty Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

2022 HD Crowdsourced VIN/Order Tracking

Some Salesman are better than others at providing updates and info once it ships. If your salesman doesn't provide you with it or doesn't know how to get it, then there isn't much you can do when it ships.
Ours has been good with sending the VIN and Ship dates as soon as he got them, not sure if he will send any other information before it arrives though. Just a waiting game now and hoping the APR's don't go up too much more before it shows up.
 
My 11/30/21 order finally went to D1 on Friday. My dealer said my estimated ship date is 2/19. Hoping its here by late March for the start of camping season.
 
Just wondering if the factory is down - we seem to have been stuck just under 700 Equipment Lists for a while - or did they find the tracking list and put a Hold on all those orders?
 
Just found out my truck is built (was able to pull up equipment list online by vin) and is now awaiting shipping. Hoping the window sticker comes out in the next couple days and it gets on the train soon. Dealer says 4 -5 weeks in transit, hoping to be surprised by a shorter time frame.

2500 Laramie Crew Cab ordered 12/23/21.
 
Finally good news and some movement. From my dealer I have a estimated ship date of 2/24. From Ram Chat I received, "I can see all the required materials for your order have been gathered and the plant has sequenced your order for production, it should be entering the build very soon! I do not see a shipping ETA, I recommend contacting us in a week for a better update" At least its postive and there should be movement soon for my rig NG193453. :cool:
 
Just wondering if the factory is down - we seem to have been stuck just under 700 Equipment Lists for a while - or did they find the tracking list and put a Hold on all those orders?
I just had a chance to check for updates. A few more popped up today. About 1/2 as many as last Monday though.
 
I just had a chance to check for updates. A few more popped up today. About 1/2 as many as last Monday though.
I think they built a lot of standard dealer orders...not sold...if you look at your other sequence sheet.
 
On Friday, I took the current "trusty Ram" to the dealer for oil change and fuel filter change. It's been too cold here for me to do it in the driveway when they have a warm shop and I needed the truck for a road trip over the weekend. i waited in the customer lounge while the work was done. They notified me over the intercom when they were finished. I walked to the service department, paid and was getting ready to walk out the door when I was paged to the sales area. When I walked in, my salesman handed me a piece of paper. I asked what it was. He responded that it was their Friday morning update build list and that mine was the first HD listed. It has a build date projected for 2/16. He said that build dates have been running +/- 3 days for their builds since 1/15 with ship dates happening 3-7 days later depending on if the trucks had to go for outside work. He said he would keep me informed. So far so good. I ordered on 10/29.
 
Today’s update from RAM Chat. “all the required materials for your order have been gathered and the plant has sequenced your order for production, it should be entering the build very soon! “
 
I just had a chance to check for updates. A few more popped up today. About 1/2 as many as last Monday though.
May I ask how you update the build and sticker fields? Back a few year’s ago the ram 1500 tracking sheet had a formula that automatically populated the link when it found a valid build or sticker. With a few tweaks that formula should still work
 
I think they built a lot of standard dealer orders...not sold...if you look at your other sequence sheet.
I think it's hard to get a sense for that looking at individual rows. Here's a summary by week: https://docs.google.com/spreadsheets/d/1ZgcSOshpXsckhTab6bTCBEZBK3ymDAR6v1zhJhy80R8/edit#gid=0
May I ask how you update the build and sticker fields? Back a few year’s ago the ram 1500 tracking sheet had a formula that automatically populated the link when it found a valid build or sticker. With a few tweaks that formula should still work
Do you have a link for that? I think there are various approaches. I've just been working on other stuff.
[QUOTE="OfficerDirtySanchez,

Line 541 is finally D1 as of today
Nice! I'm happy to hear of that progress.
 
Hi I have been tracking my work truck build. I see that apparently I got lucky with a KZOG damaged code! Must be special as its the only one on the list...... Since its a fleet truck I can not get info from anyone. Anyone have any insight in delay? Will they fix it? rebuild it? Thanks
vin= 3C6UR5DL0NG109206
 
Hi I have been tracking my work truck build. I see that apparently I got lucky with a KZOG damaged code! Must be special as its the only one on the list...... Since its a fleet truck I can not get info from anyone. Anyone have any insight in delay? Will they fix it? rebuild it? Thanks
vin= 3C6UR5DL0NG109206

KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
 
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
Thanks I am aware of what it stands for the question is around what the next steps are in repair/replace/delivery
 
Im in KZT status "2nd rail depature" any idea what exactly that means as a difference between that and KZM "1st rail departure"

KZM maybe AM departure
KZT maybe PM departure

this was from the dealership vin track update KZT rail ship date 1-17-22 10:21 pm , ramp eta 2-5-2022 9:52 pm---sure hope that holds true that is at the railyard this saturday
 
Im in KZT status "2nd rail depature" any idea what exactly that means as a difference between that and KZM "1st rail departure"

KZM maybe AM departure
KZT maybe PM departure

this was from the dealership vin track update KZT rail ship date 1-17-22 10:21 pm , ramp eta 2-5-2022 9:52 pm---sure hope that holds true that is at the railyard this saturday
I've always assumed 1st rail departure is from the factory and 2nd rail departure is from Eagle Pass, TX. My understanding is that there is a carrier in Mexico and that it switches to another one once it gets to the US.
 
Last edited:
Back
Top