Truck finally made it! Ordered 7/26, Built 10/6, loaded on rail car around 10/13, made it to rail yard near Phoenix 10/22 and then to local dealer on 10/25.

3500 SO Tradesman with 8.4” screen, bed utility group, 50 gallon tank, 5th wheel prep, and some others. I was told during the build process that the 50 gallon tank delayed things for a short while.

Delayed??? I'd take that delay any time LOL. Ordered mine 6/17 with no build date in sight.......

Congrats!
 
Truck finally made it! Ordered 7/26, Built 10/6, loaded on rail car around 10/13, made it to rail yard near Phoenix 10/22 and then to local dealer on 10/25.

3500 SO Tradesman with 8.4” screen, bed utility group, 50 gallon tank, 5th wheel prep, and some others. I was told during the build process that the 50 gallon tank delayed things for a short while.
Interesting to hear that about the 50gal tank. I wonder if that's why my 7/19 build has yet to make it to D1. Good looking truck btw.
 
Interesting to hear that about the 50gal tank. I wonder if that's why my 7/19 build has yet to make it to D1. Good looking truck btw.
I hope not, got one on my 10/7 order. Haven't checked any of the sites. I like to keep the blood pressure down. Besides, I won't get my new travel trailer till next summer. I'll just keep paying down the trade in.
 
Is seem the longhorns and limited truck with the HO are held up in storage. My truck been sitting for awhile with some others. I did see some standard diesels Longhorns/ limited start to move and get window stickers .
Who knows why we are in some sort of purgatory. So many other trucks ordered same time as mine shipped and even delivered. My truck has been sitting in storage now for 3 weeks. It would be nice if we could at least be told why. Mine is a fully loaded HO Limited Mega SRW.
 
Truck finally made it! Ordered 7/26, Built 10/6, loaded on rail car around 10/13, made it to rail yard near Phoenix 10/22 and then to local dealer on 10/25.

3500 SO Tradesman with 8.4” screen, bed utility group, 50 gallon tank, 5th wheel prep, and some others. I was told during the build process that the 50 gallon tank delayed things for a short while.
Yet another truck not held on recall
 
Truck finally made it! Ordered 7/26, Built 10/6, loaded on rail car around 10/13, made it to rail yard near Phoenix 10/22 and then to local dealer on 10/25.

3500 SO Tradesman with 8.4” screen, bed utility group, 50 gallon tank, 5th wheel prep, and some others. I was told during the build process that the 50 gallon tank delayed things for a short while.
Beautiful color, that was my last two rams color,
 
Wow, you have a very well optioned BH. Nice truck!
My last truck was a big horn and the cloth seats actually did very well. I couldn't justify the extra $4,500 for the laramie with leather, fender flares and auto high beams haha
 
Nice to see some of the oldest orders and top of the list filling in more and more faster then when I first joined the group. Now to get to September orders some day soon!!

September? I’m still waiting for my July 20th to populate a build sheet. Been in D1 most of the month with an estimated build date of 11/8. Not sure if the build date starts with framing or assembly of the components?
 
My last truck was a big horn and the cloth seats actually did very well. I couldn't justify the extra $4,500 for the laramie with leather, fender flares and auto high beams haha
With the options you chose, it’s just over 2k more for the level a Laramie and 3k for the level b.
 
Talked to the ever reliable ram hat this am. Said they were still gathering parts but it showed a parts update on Oct 25, whatever that means. Ordered my truck Aug 28. Vin: 3C6UR5NL6NG160174
 